{"id":6593,"date":"2021-05-25T10:12:00","date_gmt":"2021-05-25T10:12:00","guid":{"rendered":"https:\/\/www.masats.es\/masats-suministrara-las-puertas-de-los-trenes-de-stadler-para-catalunya\/"},"modified":"2021-05-25T10:12:00","modified_gmt":"2021-05-25T10:12:00","slug":"masats-to-supply-the-doors-for-stadler-trains-in-catalonia","status":"publish","type":"post","link":"https:\/\/www.masats-llc.com\/en\/masats-to-supply-the-doors-for-stadler-trains-in-catalonia\/","title":{"rendered":"Masats to Supply the Doors for Stadler Trains in Catalonia"},"content":{"rendered":"\n<p>The Catalan railway company Ferrocarrils de la Generalitat de Catalunya (FGC) awarded a contract to the company Stadler Rail Valencia to build 15 UT 115 electrical trains for the Vall\u00e8s underground line.<\/p>\n\n\n\n<p>The company Masats was chosen by Stadler Rail to supply the doors for these 15 international gauge trains comprised of 4 cars each. The order includes 360 passenger doors and 60 automatic cabin doors. A total of 420 systems will be supplied to improve access to the trains as well as passenger entry and exit times.<\/p>\n\n\n\n<p>The passenger doors are high-performance double 00Gc electric sliding doors for which Stadler sought the greatest of passenger availability and information. These doors are highly reliable and safe.<\/p>\n\n\n\n<p>The cabin doors are one-leaf electric sliding doors manufactured by Masats at its plant in Sant Salvador de Guardiola (Barcelona).&nbsp; They feature the most modern of safety elements. The cabin door has an innovative pendular movement mechanism that closes and locks the door upwards. This system offers top-quality soundproofing and thermal insulation for optimal driver comfort.<\/p>\n\n\n\n<p>Production will be carried out at the Masats plant in Barcelona.<\/p>\n\n\n\n<p>The trains will be able to absorb the growth in passengers deriving from the extended service offered to Terrassa and Sabadell in addition to increases in service frequency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Catalan railway company Ferrocarrils de la Generalitat de Catalunya (FGC) awarded a contract to the company Stadler Rail Valencia to build 15 UT 115 electrical<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":2551,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-6593","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/posts\/6593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/comments?post=6593"}],"version-history":[{"count":0,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/posts\/6593\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/media\/2551"}],"wp:attachment":[{"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/media?parent=6593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/categories?post=6593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.masats-llc.com\/en\/wp-json\/wp\/v2\/tags?post=6593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}